Lesson 146: What Is Microduct?

Introduction

Microduct is a small diameter duct built to hold a microcable, a small fiber optic cable made for installation with moving air. Dura-Line describes its MicroDucts as smaller diameter conduit manufactured from flexible high density polyethylene, called HDPE. A microduct can run on its own, sit inside a larger duct, or travel with other microducts inside one shared outer covering.

Level 8 studies the underground pathway piece by piece. Lesson 145 taught innerduct, the divider that splits a standard duct into channels for standard size cables. This lesson teaches the smaller system that follows it: a pathway sized for microcables, where the condition of the bore and the quality of every joint decide whether the cable can travel at all.

What This Lesson Gives You

  • Look at a small duct in a structure or on a reel and tell whether it is a single microduct, a microduct inside a larger duct, or one tube in a bundled group.
  • Explain how moving air carries a microcable through a microduct, and why a smooth, continuous, airtight bore matters more here than in a pulled pathway.
  • Name the parts that keep a microduct path continuous: the tube itself, the coupler that joins two sections, and the end stop that closes an open end.
  • Check a microduct end and a joint for the signs that matter before any cable is blown: correct tube identity, square cut, coupler seated, no crush or kink, and open ends closed.
  • State the hold decision when a microduct is crushed, blocked, leaking at a joint, or unidentified, and name what must be proven before a blowing attempt begins.

Start With the Basics

Picture a drinking straw carrying a light paper ball. A gentle stream of air through the straw moves the ball because the straw is small, smooth, and sealed along its length, so the air has one path and the ball rides that path. A straw with a crack, a pinch, or a loose joint leaks the air sideways, and the ball slows or stops even though the straw still looks like a tube from the outside.

Microduct works through the same mechanism at field scale. The tube is the straw. The microcable is the light load the air helps carry. The blowing machine adds a controlled push at the entry, and moving air inside the tube does the carrying work along the run. The Fiber Optic Association, called FOA, explains the method plainly: the cables are carried in microducts using compressed air and a machine that pushes the cable into the duct, and the blowing air floats the cable in the duct and reduces friction so the machine can push the cable through. A leak, a pinch, or a rough joint breaks the conditions that let the air do that work.

What Is It?

Microduct is a pathway system, with a tube, a cable made to fit the tube, a way to join tube sections, and a way to close open ends. The definitions below build the picture in that order.

Microduct defined. A microduct is a small diameter duct that provides a dedicated pathway for one microcable. Dura-Line product literature states the size idea in general terms: MicroDucts are smaller diameter conduit, manufactured from flexible HDPE. The exact size of a given tube is named as an outside diameter and inside diameter pair on the product data sheet. As one named example only, the Dura-Line MicroDuct HDPE 12.7/8 data sheet names a product by that outside and inside diameter pair. That pair belongs to that product. Field staff read the size for a job from the data sheet for the product selected and from the project documents, and no size from one product sets a rule for another job.

Microcable. A microcable is a small, light fiber optic cable designed to be installed into a microduct by blowing or jetting. FOA material notes that small cable size and light weight matter for this method, because the air has to float and carry the cable. A standard loose tube cable built for pulling belongs in the duct and innerduct pathways taught earlier in this level. A microcable belongs in a microduct matched to it by the design.

Blowing and jetting. Blowing, also called jetting, is the installation method that uses compressed air flowing through the duct together with a mechanical push from a blowing machine at the entry. An industry application note from STL describes the same combination: cable installation by using high speed air flow combined with additional mechanical pushing force is called blowing or jetting. The air reduces contact between the cable jacket and the duct wall by floating the cable, and the machine feeds the cable in a controlled way. The cable travels on air for the length of the run, which is why the whole run has to support moving air.

Single microduct. A single microduct is one tube installed on its own route or placed inside a larger duct. Dura-Line lists installation settings for its microduct products that include placement inside subdivided conduit, along with trench, plow, directional bore, and microtrench work, with the data sheet for the selected product governing its own list. Placed inside a larger duct, a set of single microducts subdivides that duct at a much smaller scale than the innerduct in Lesson 145.

Bundled microduct. A bundle is two or more microducts factory joined under one outer covering so the group installs as one unit. Dura-Line calls its bundled product FuturePath and describes it directly: FuturePath is a unit of bundled MicroDucts, manufactured from flexible HDPE, with the individual tubes held under a polyethylene oversheath, the outer covering that binds the bundle. At a structure, a crew can open the oversheath and route one tube toward its destination while the other tubes continue or wait. The bundle count and tube sizes for a job come from the design and the data sheet for the configuration selected.

Coupler, also called a connector. A coupler is a fitting that joins two microduct sections into one continuous path. In the Hexatronic document cited in this lesson, the connectors and end stops family is listed in three versions: straight connectors join sections of microducts, reduction connectors join microducts of different dimensions, and end stops block open duct ends. Hexatronic connector literature describes pressure tight seals in the connector design and a clear body. Other Hexatronic connector documents state the inspection purposes of that clear body: visual inspection to ensure the tube is inserted correctly, and visual inspection of a blown fiber or microcable that has been installed. A joint in a microduct has two jobs at once: it must hold air, and it must present a smooth inside passage with no step or gap for the cable to catch on.

End stop. An end stop, also called an end cap in manufacturer literature, is a fitting that closes the open end of a microduct. Hexatronic states the purpose directly: end stops are used to block open duct ends and prevent water and dirt from entering the microduct. An empty microduct left open collects the same mud and grit that ruin any pathway, at a scale where a small amount of debris fills a large share of the bore.

Interior surface and lining. The inside wall of a microduct is a working surface, because the cable slides and floats against it for the full run. Dura-Line data sheets describe two features on its products. Internal ribs are standard on its MicroDucts, with an exception the sheets state for the smallest inside diameter products, which carry a smooth interior. Its SILICORE ULF lining is described as a slick, permanent interior lining coextruded inside the HDPE wall, with a coefficient of friction value the manufacturer states by its own internal test method on the data sheet. Both features belong to the named products and their data sheets. Field staff confirm the product on the reel matches the documents instead of assuming every microduct interior is the same.

Sizing and fill, and where the numbers live. Fill for a microduct is the relationship between the outside diameter of the microcable and the inside diameter of the tube, expressed by manufacturers as a fill ratio for their products. Dura-Line gives exact guidance for its MicroDuct products, including FuturePath: choose the correct MicroDuct size based on the outside diameter of the desired MicroCable, and Dura-Line recommends a fill ratio of 50 percent to 75 percent for optimal cable placement performance on those products. That range belongs to Dura-Line and its products. Dura-Line also notes that route condition and bends affect jetting performance. No universal fill number governs every microduct and every microcable. The governing values for a job come from the cable and duct manufacturer instructions for the products selected and from the project documents.

Identification. Microducts are told apart by color and by printed marking. Dura-Line data sheets list solid colors for its MicroDucts and describe permanent marking along the tube that includes material, relevant standards, production information, and sequential feet or meter markings. Inside a bundle, color is the identity that lets a crew follow one tube from one structure to the next and branch the correct tube at each point. The project documents and the owner identification scheme govern which color serves which destination on a given job.

What Does It Look Like?

A beginner meets microduct on the reel, inside a larger duct, and at the open end in a structure. The tubes are small enough to change what the eye should look for.

On the reel and at staging:

  • A coil or reel of small, flexible plastic tube, single or in a flat or round bundle, far smaller in diameter than the standard duct from Lesson 144.
  • Tube colors that differ from tube to tube inside a bundle, so each pathway can be told apart at both ends of a run.
  • Printed markings along the tube. Dura-Line data sheets describe permanent marking with material, relevant standards, production information, and sequential feet or meter markings.
  • An outer oversheath around a bundle, smooth and continuous, with the individual colored tubes visible where the sheath has been opened at an end.
  • Small push fit couplers and end stops in a parts container, sized to the tube, some with clear bodies that show the tube end inside when seated.

At the open end in a structure:

  • One small tube end, cut square, entering a coupler or closed by an end stop, with a label or color that matches the record for that pathway.
  • A bundle arriving with its oversheath opened in an orderly way, individual tubes separated and routed, each tube keeping its color identity from entry to exit.
  • A single microcable leaving one tube toward a splice case or terminal, with neighboring empty tubes closed by end stops.
  • A microduct running inside a larger duct, visible at the duct mouth as a small tube or a bundle occupying part of the larger bore, with the larger duct record naming the microduct pathways inside it.

Condition signs a beginner can read without touching cable:

  • A tube pinched flat, kinked sharply, or ovaled where a round bore should be, so the inside passage is narrowed at that point.
  • A coupler with the tube end visibly short of full insertion in a clear body, or a joint that sits crooked, so the inside passage may hold a step or a gap.
  • An open tube end with no end stop, facing down or sitting in structure grit, with mud or water visible at the opening.
  • Tube colors or labels that disagree with the record, or a bundle where tube order at this structure cannot be matched to the order at the next structure.
  • A tube end cut at an angle or crushed by the cut, leaving a ragged edge at the exact point where a cable must enter or pass.
  • Oversheath damage that exposes or nicks the tubes inside the bundle at a bend or at the structure entry.
Whiteboard illustration: one microduct between two handholes with a microcable floating on air inside it, a cross-section inset showing the cable centered in the bore, and a coupler inset with both tube ends fully seated

What Does It Do?

Microduct earns its place through four mechanisms. Each one follows from the match between a small tube, a small cable, and moving air.

A dedicated small pathway matches the cable to the bore. A microcable in a standard duct has room to spiral, stall, and behave unpredictably under air or pull. In a microduct, the bore is sized to the cable under the manufacturer guidance for the pair, so the air stream acts on the cable along the run and the cable stays guided by the wall. Sizing is a matched pair decision, duct inside diameter against cable outside diameter, made at design from manufacturer instructions.

Moving air carries the cable and lowers friction along the run. In a pulled installation, force enters at one end and friction accumulates against the cable for the whole length. In a blown installation, the STL application note explains, high speed air flows through the duct and along the cable while the pushing device applies force near the cable inlet, and the air keeps the cable in a floating condition that reduces friction between the cable outer surface and the duct inner wall by reducing contact. FOA describes the same result: the blowing air floats the cable and reduces friction so the machine can push the cable into the duct. The pathway condition that makes this possible is a continuous bore that holds air from entry to exit.

Bundling installs many pathways for one construction pass. A bundle places several microducts in one trench, bore, microtrench, or existing duct in a single operation. FOA writing on microducts notes the capacity effect in dense areas, where space is limited and adding cables to current conduits and ducts is a working use of the system. Each tube in the bundle is a separate future installation waiting for its cable. The construction cost is paid once, while the cables can arrive one at a time as services are sold.

Couplers and end stops keep the path continuous and clean between blowing days. A route built in sections becomes one blowing path only when each joint holds air and passes the cable smoothly. A coupler that seals and aligns the two tube ends makes two sections behave as one tube. An end stop keeps an unused tube clean and dry while it waits, so the tube that was proven at construction is still the tube the blowing crew meets later. The fittings are small. Their effect on whether the system works is total.

Where Does It Fit?

Microduct sits inside the underground pathway sequence, after the route exists and before the microcable arrives, and it changes how later growth happens.

  • Design. The designer selects single tubes or a bundle, tube sizes matched to the planned microcables, bundle count, branch points, and tube assignments. Fill and sizing decisions live here, governed by the manufacturer instructions for the products selected and the project documents.
  • Pathway construction. Crews place microduct by the methods the product data sheet and project documents allow, including trench, plow, directional bore, microtrench, and placement inside an existing larger duct. Hexatronic installation instructions for microduct assemblies in existing conduits describe deployment by pulling and by blowing the assemblies into the existing duct, with the note that blowing into an existing duct requires that duct to hold pressure.
  • Proving the pathway. Before any microcable is blown, the continuous path is checked: tube identity confirmed at both ends, joints seated, bore clear and able to hold air as the project documents and manufacturer instructions direct. A pathway that has never been proven is a claim, and blowing day is the wrong day to test the claim with a cable inside.
  • Cable placement. A qualified blowing crew installs the microcable into its assigned tube with a blowing machine and compressed air, under the cable and duct manufacturer instructions for the products in hand. This lesson teaches the pathway the method depends on. Operating blowing equipment belongs to trained crews.
  • Branching and splicing. At structures, individual tubes leave the bundle and route to splice cases, terminals, or building entries, while spare tubes pass through closed and identified. The tube record tells the splicer which cable arrived in which tube and from which direction.
  • Growth and replacement. A new service uses a spare tube. A damaged microcable can be removed and a replacement blown into the same tube where the manufacturer instructions and project documents allow that work, leaving neighboring tubes and their cables undisturbed.
  • Records. The as-built record carries the tube map: structure to structure, bundle configuration, tube color and assignment, occupied or spare status, and joint locations where the documents require them. A tube that exists in the ground and appears in no record will be found again during an urgent job.
  • The neighboring lessons. Lesson 145 taught innerduct for standard size cables installed by pulling. Microduct is the smaller companion system: smaller tubes, smaller cables, and air as the carrying force. The two systems can share a route and even a duct, and the record must keep their identities separate.

What Is at Stake

A blowing attempt that stalls mid-run. Air escapes at a leaking joint, a pinch narrows the bore, or debris blocks the path, and the cable stops partway with its length committed inside the tube. Recovery costs crew time and can cost the cable, and the cause is usually a pathway defect that a pre-blow check would have caught while the fix was still easy.

Cable damage from forcing a bad path. A cable pushed against a step at a poor joint, a sharp cut edge, or a crushed section takes jacket damage at the defect. The damage sits hidden inside the tube and can surface later as a failed test or a failed service.

Capacity that exists on paper only. Tubes crushed during placement, joints that leak, ends left open to mud, or bundle counts that differ from the record leave less capacity than the plan shows. The shortage surfaces when a sold service depends on a spare tube that cannot accept a cable.

Identification errors at branch points. Tubes of the wrong color branched at a structure send a cable toward the wrong destination or leave the correct destination unserved. Color and label discipline at every structure, matched to the record, is the control, because a bundle hides its tubes between structures and color is the only identity a crew can check at the ends.

Money spent twice on the same route. A route built with spare tubes pays for pathway capacity once, during open construction. A route built with exactly the tubes needed today pays construction costs again when the next service needs a path. Microduct bundles exist to make the spare capacity cheap at build time.

Safety around blowing work. Compressed air equipment, blowing machines, and opening structures carry hazards covered by the safety lessons in this course and by equipment manufacturer instructions. Microduct adds decisions that must stay inside qualification limits, covered in the field checklist at the end of this lesson.

What Does Good Look Like?

  • Every tube matches the plan for size, color, and assignment, and the tube count at this structure matches the count at the next structure.
  • Tube ends are cut square and clean, couplers sit straight with each tube fully seated as the fitting manufacturer directs, and clear coupler bodies show the tube end in its correct position.
  • Spare tubes sit closed with end stops fitted, identified, and recorded as spare.
  • Occupied tubes hold their assigned microcable, with the cable leaving the tube cleanly toward the splice case or terminal, free of sharp bends at the tube mouth.
  • Bundles enter and leave structures with the oversheath intact up to the planned opening point, tubes separated in order, and no nicked or pinched tube at the separation.
  • No tube shows crush, kink, ovaling, or heat damage, and no open end shows mud, grit, or standing water.
  • Joints appear in the record where the project documents require them, and a reader at the open structure can verify the tube map against the tubes in view.
  • The pathway for the next blowing job has been proven as the documents direct, and the proof is recorded with the tube identity it belongs to.
Whiteboard illustration: three panels comparing a single microduct, a bundle of microducts under one oversheath with a spare tube end stopped, and microducts placed inside a larger duct

From the Field

Picture a handhole on a distribution route built with a bundled microduct. Several tubes in the bundle already carry microcables in service. One tube sits spare, closed with an end stop, recorded in the as-built with its color noted at both structures.

A new service order directs a blowing crew to install a microcable into that spare tube. At the handhole, the crew removes the end stop and prepares the joint where a short tube section connects the bundle to the building entry path. In the clear body of the coupler, the tube end on one side sits visibly short of the position the other side shows. The joint looks closed from the outside. The inside passage tells a different story: a gap and a step where the cable must pass, and a seal that cannot be trusted to hold air.

The crew lead feels the schedule pressure plainly. The blowing machine and compressor are on site, the customer appointment is set, and reseating a small fitting looks like a delay over a fraction of an inch. Blowing anyway would take minutes to attempt.

The lead stops and works the problem in the order this lesson teaches. The cable travels on air, so the path must hold air and stay smooth for the full run. A joint that leaks bleeds the air stream that floats the cable, and a step inside the joint is a catching point at the exact place the cable cannot be reached once the blow starts. The crew reseats the tube in the coupler as the fitting manufacturer directs, confirms the tube end position through the clear body, and proves the path as the project documents require before any cable enters the tube.

The proof holds. The cable blows into its assigned tube in one run, the neighboring tubes and their services were never disturbed, and the record gains a note naming the joint that was corrected.

The rule to carry is simple: a microduct path is proven joint by joint before a cable rides the air, and a joint that cannot be seen seated and sealed holds the blow until it is corrected and proven.

What Can Go Wrong?

Blowing into a leaking joint. Air escapes at the coupler, the stream that floats the cable weakens, and the cable stalls partway or arrives with damage from being pushed against rising friction. The joint was the defect. The cable pays for it.

A step or gap inside a coupler. A tube seated short leaves an edge inside the passage. The cable tip or jacket catches the edge, and force from the machine drives the cable into the obstruction instead of past it.

Forcing a cable through a crushed or kinked tube. The narrowed bore concentrates contact and pressure on the jacket. The blow may stall, the cable may be damaged at the pinch, or the tube may split and trap the cable mid-run.

Leaving spare tubes open. An unstopped end collects water, mud, and grit. In a small bore, a little debris is a large blockage, and a sound tube becomes an unusable tube by neglect.

Cutting a tube end at an angle or with a crushing cut. The ragged end will not seat or seal correctly in its fitting, and the edge it leaves inside the path can shave or catch the cable jacket during the blow.

Branching the wrong tube at a structure. Colors misread, labels missing, or tube order lost when the oversheath opens sends the cable to the wrong destination. The error is found at splicing or at activation, after the blow is complete.

Mixing sizing guidance between products. A fill range or size pairing taken from one manufacturer document and applied to another product ignores the matched pair the method depends on. Sizing comes from the instructions for the duct and cable actually selected.

Treating a bundle as one pathway. A bundle is several pathways sharing a sheath. Work that handles the bundle roughly, pinches it at a bend, or damages the oversheath can harm every tube inside at once, turning one handling error into a route wide loss.

Skipping the proof to save time. An unproven tube that fails mid-blow costs the machine time, the crew time, and possibly the cable. The proof is the cheapest step in the whole installation, and it is the step that protects every later step.

What Should Someone Notice in the Field?

  • Count the tubes at the structure and compare count, sizes, colors, and bundle configuration against the plan and the as-built record.
  • Match each tube identity, by color or label, to the record, and confirm the same identity at the far structure before assigning any blow.
  • Check every coupler for a straight seat, and where the body is clear, confirm the tube end sits in its correct position with no visible gap.
  • Check every spare tube for an end stop fitted, a square clean end at any open joint, and identification recorded as spare.
  • Look for crush, kink, ovaling, split, or heat damage on each tube, and for oversheath damage where a bundle bends or enters the structure.
  • Look inside each open end as far as light allows for mud, grit, water, or debris, and record any tube that cannot be seen clear.
  • Check the cable exit at each occupied tube for a smooth path with no sharp bend or edge pressure at the tube mouth or coupler.
  • Photograph the tube ends, couplers, and bundle separation, and record any mismatch with the record before closing the structure, naming the tube by its identity.
  • Hold any blowing job when a tube is crushed, blocked, leaking at a joint, unseated in its coupler, or unidentified, and report the condition for a pathway decision instead of blowing into an unproven path.
  • Know the boundary: recognizing microduct, counting and identifying tubes, checking coupler seating and end stops by sight, and reporting condition are tasks covered by this lesson. Designing microduct systems, selecting products and sizing pairs, operating blowing machines and compressors, entering confined spaces under a permit program, and directing pathway repairs belong to qualified people under the project documents and their training. Reading this lesson qualifies no one for that work, and no one should open a structure, handle pressurized air equipment, or join a blowing operation beyond their assignment, training, and authorization.

Key Terms

Microduct: A small diameter duct that provides a dedicated pathway for one microcable, installed singly, inside a larger duct, or in a bundle.

Microcable: A small, light fiber optic cable designed to be installed into a microduct by blowing or jetting with compressed air.

Blowing or jetting: Installing a microcable using high speed air flowing through the duct together with a mechanical push from a blowing machine at the entry, with the air floating the cable to reduce friction.

Bundle: Two or more microducts factory joined under one oversheath so the group installs as one unit. Dura-Line calls its bundled product FuturePath.

Oversheath: The outer covering that binds the microducts in a bundle into one installable unit.

Coupler: A fitting that joins two microduct sections into one continuous, airtight, smooth path. Also called a connector. A reduction coupler joins tubes of different dimensions.

End stop: A fitting that closes the open end of a microduct to keep water and dirt out while the tube waits for its cable. Also called an end cap.

Fill ratio: The manufacturer stated relationship between microcable outside diameter and microduct inside diameter for a product pair, used to select the correct tube size for a cable.

Check Your Understanding

  1. What is a microduct, and how does its cable get installed differently from a standard cable in innerduct?

Answer: A microduct is a small diameter duct that provides a dedicated pathway for one microcable. Its cable is installed by blowing or jetting: compressed air flows through the duct and floats the cable to reduce friction while a blowing machine pushes the cable in at the entry. A standard cable in innerduct is pulled through its channel with a tape or line.

  1. Why does a coupler in a microduct path have two jobs instead of one?

Answer: The coupler must hold air, because the cable travels on the air stream and a leak weakens the stream that floats the cable. The coupler must also keep the inside passage smooth and aligned, with no step or gap, because the cable passes through the joint and can catch or take jacket damage at an edge inside the fitting.

  1. Dura-Line recommends a fill ratio range for optimal cable placement on its MicroDuct products, including FuturePath. State the range, state whose range it is, and state what a crew does when the job uses another manufacturer product.

Answer: The range is 50 percent to 75 percent, and it is Dura-Line guidance for its MicroDuct products, including FuturePath. With another manufacturer product, the crew takes the sizing and fill guidance from the instructions for the duct and cable actually selected and from the project documents, because sizing is a matched pair decision and no universal number governs every product.

  1. In the From the Field scenario, why did the crew lead refuse to blow the cable through a coupler that looked closed from the outside?

Answer: The clear coupler body showed the tube end seated short, leaving a gap and a step inside the passage and a seal that could not be trusted to hold air. A leak would bleed the air stream that floats the cable, and the step is a catching point the cable would meet mid-blow where it cannot be reached. The lead had the tube reseated as the fitting manufacturer directs and proved the path before any cable entered the tube.

  1. A spare microduct and a spare innerduct channel both look empty at a handhole. Name two checks that apply to the microduct spare before it is assigned, and state why its end fitting matters more than its emptiness.

Answer: Any two count: end stop fitted and tube identified as spare in the record with color matching at both ends; coupler seats verified where joints exist, with tube ends fully seated; bore clear of mud, grit, and water as far as can be checked; no crush, kink, or ovaling along the visible tube. The end fitting matters because an open end collects water and dirt, and in a small bore a little debris is a large blockage, so an unstopped spare can be empty and still unusable.

Lesson Takeaway

A standard duct forgives small defects because a pulled cable can be worked past them. A microduct forgives very little, because its cable rides on air through a small bore and every joint, cut, and pinch sits directly in that air path. After this lesson, a microduct reads as a sealed system to be proven: tubes counted and identified, couplers seated and seen, spare ends stopped, bore clear. A reader who sees the pathway that way protects the blow before it starts and treats an unproven joint as a finding to fix while the fix still costs minutes.

Sources and Technical References

Fiber Optic Association, The FOA Reference for Fiber Optics, Fiber Optic Installation. Covers blown cable installation in microducts using compressed air and a machine that pushes the cable, with the air floating the cable and reducing friction: https://www.foa.org/tech/ref/basic/install.html

Fiber Optic Association, FOA Newsletter, microduct and microcable material. Covers microcables designed to be blown into microducts, small cable size and light weight for the method, adding cables to current conduits and ducts with microducts, and microtrenching as an installation setting: https://www.thefoa.org/foanl-8-17.html

Dura-Line, FuturePath MicroBundles Technical Data Sheet. Covers FuturePath as a unit of bundled MicroDucts manufactured from flexible HDPE under a polyethylene oversheath, installation types, colors and markings, the SILICORE ULF coextruded lining, internal ribs, and the recommendation to choose MicroDuct size by microcable outside diameter with a fill ratio of 50 percent to 75 percent for those products: https://www.duraline.com/-/pdf/US/en/543/US/en/FuturePath 12-way 5_3_5 mm.pdf

Dura-Line, MicroDucts HDPE Technical Data Sheet, MicroDuct HDPE 12.7/8. Covers a single MicroDuct as smaller diameter conduit manufactured from flexible HDPE, solid colors, permanent markings with material, standards, production information and sequential feet or meter markings, the SILICORE ULF lining, and internal ribs as standard with a smooth interior exception for the smallest inside diameter products: https://www.duraline.com/-/pdf/US/en/749/US/en/MicroDuct%20HDPE%2012_7_8.pdf

Hexatronic, Microduct Connectors and End Stops. Covers straight connectors joining sections of microducts, reduction connectors joining microducts of different dimensions, end stops blocking open duct ends to prevent water and dirt from entering, pressure tight seals, and clear bodies that facilitate visual inspection of tube insertion and of an installed blown fiber or microcable: https://www.hexatronic.com/hubfs/6655624/pim_images/28701-N-MPB30601+_fi_Hexatronic_13247.pdf

Hexatronic, Connectors, End Stops and Reducers (FDCX-NPA10 family). Covers the fully transparent clear body for visual inspection to ensure the tube is inserted correctly: https://www.hexatronic.com/hubfs/6655624/pim_images/28701-N-FDCX-NPA10+_en_Hexatronic_29543.pdf

Hexatronic, Connectors and End Stops (NPA10201 family). Covers the clear body that facilitates visual inspection of a blown fiber or micro cable that has been installed: https://www.hexatronic.com/hubfs/6655624/pim_images/28701-N-NPA10201+_en_Hexatronic_29989.pdf

Hexatronic, Installation of Microduct Assemblies in Existing Conduits. Covers deployment of microduct assemblies into existing conduits by pulling and by blowing, and the requirement that an existing duct hold pressure before microducts are blown into it: https://www.hexatronic.com/hubfs/product-documents/1531-MPB30290_Microduct%20Assemblies%20in%20Existing%20Conduits.pdf

STL, Optical Fiber Cable Installation by Blowing, Application Note. Covers blowing or jetting as high speed air flow combined with additional mechanical pushing force, air flowing through the duct and along the cable, and the floating condition that reduces friction between the cable outer surface and the duct inner wall by reducing contact: https://stl.tech/wp-content/uploads/2023/04/Installation_of_optical_fiber_cable_by_blowing-final-1.pdf


Previous lesson: Lesson 145: What Is Innerduct? |
Back to Level 8 hub |
Next lesson: Lesson 147: What Is a Duct Bank?