Lesson 67: What If a Utility Is Mismarked?

What You Are Learning

By the end of this lesson you will be able to explain, in plain language, what a mismark is and name its four common forms. You will be able to describe how a mismark is usually discovered, including a facility found outside its marks, a facility found outside its tolerance zone, an empty pothole where a facility was expected, and a facility found where no marks are at all. You will be able to state the correct response in order: stop work in the vicinity, protect the facility or the search area, notify the facility owner directly or through the 811 notification center, request a correction or re-locate through the ticket process for that state, and document what was found with measurements and photographs. You will be able to explain why you never move the paint yourself, never replant a flag from memory as if it were a new locate, and never keep digging on a guess. You will also be able to tell a mismark apart from two look-alike problems, an unmarked or unknown utility and a faded or destroyed mark, because each one is handled through a related but distinct ticket step.

This lesson teaches recognition and reporting. Reading it does not qualify you to locate or re-locate a facility, to mark or re-mark a facility for an owner, or to direct excavation near a facility. Locating belongs to the facility owner and its locator. Excavation decisions belong to the responsible crew leadership, working under the damage prevention law of the state where the work occurs and the rules of the project. Your job in this lesson is to spot the mismatch, protect what you found, and get the correction started through the proper channel.

Start With the Basics

Start with what you already know from earlier lessons in this level. Before excavation, an excavator gives notice through the notification center for the state, commonly reached by dialing 811. A facility owner is the company, agency, or person that owns or operates a buried facility and holds its records. A facility is the buried thing itself, such as a pipe, cable, conduit, or duct. A locator is a person who works for the owner or for a locating contractor, uses the owner records and detection equipment, and places temporary marks on the surface to show the approximate horizontal position of the facility. A mark is that surface message, in paint, flags, stakes, or whiskers. Lesson 59 taught that marks communicate approximate position, facility type by color, owner identity, size or count where written, and direction of run. Marks do not give exact position and they do not give depth.

Lesson 63 taught the tolerance zone. A tolerance zone is the horizontal band made of the width of the facility plus a set distance on each side of the outside edge of the facility. The set distance is set by state law. Inside that band, work methods change to careful methods until the facility is exposed and confirmed. Lesson 65 taught potholing, also called daylighting or test holing, which is the careful exposure of a facility at a specific point so its precise horizontal and vertical position can be seen, measured, and recorded.

Now add the problem this lesson covers. Sometimes the message on the surface does not match the facility in the ground by more than the normal approximate margin. The paint can be in the wrong place. The wrong line can have been traced. A line that should have been marked can be missing from the marks. Or a careful exposure can find nothing where the marks said a facility should be. When that happens, the crew is no longer working from an approximate map with a known margin. The crew is working from a wrong map. This lesson is about recognizing that moment and responding to it in the way the damage prevention system is built to handle it.

Two working words need clear definitions before anything is built on them.

A re-locate, also called a re-mark or a correction request in different states, is a request made through the notification center or directly to the owner, under the ticket process for that state, asking the owner or its locator to return, check the facility, and place corrected marks. The names for the ticket type vary by state. The act is the same in shape everywhere: the excavator reports the problem through the system, and the owner side fixes the marks.

Positive response, covered in Lesson 64, is the system in many states through which owners report the status of a locate request, so the excavator can check which owners have marked, which have no facilities in the area, and which have not yet responded. Positive response matters here because a mismatch can be first visible when the response record and the ground do not agree.

What Is It?

A mismark is a set of marks that does not correctly represent the facility it claims to represent, beyond the normal approximate margin that the tolerance zone is built to absorb. In the language of the Common Ground Alliance, usually shortened to CGA, Best Practice 5-21 is titled Mismarked Facilities. That practice covers two starting cases: an underground facility is not found where one has been marked, or an unmarked underground facility is found. Field practice and state guidance use the word mismark more broadly for the family of marking errors below. All four forms share the same core fact: the marks and the ground disagree in a way the crew cannot resolve by itself.

The first form is the offset mark. The facility is real and it was located, but the marks sit to one side of it. A small offset inside the tolerance zone is the normal approximate condition that Lesson 63 covered, and it is not by itself proof of a mismark. An offset becomes a mismark concern when careful exposure finds the facility farther from its marks than the tolerance distance allows, so the facility lies outside the band the crew expected from the marks, or far enough from the marks that the marks would mislead the next step of the work. The tolerance zone itself is built from the facility: its width plus the state set distance on each side of its outside edge. At that point the paint is not a rough guide to the facility. It points at ground the facility does not occupy, while the facility occupies ground the paint did not warn about.

The second form is the wrong facility marked. The locator traced and marked a different line than the one the owner intended to show. This can happen in a crowded corridor where several lines run close together, where an abandoned metallic line sits near a live line, where a tracer wire or signal connects to the wrong plant, or where records point to the wrong alignment. The marks look complete and confident. They simply belong to another facility. The facility the crew cares about may be unmarked a short distance away, and a different facility now carries marks that do not belong to it.

The third form is the missed facility. A facility that should have been marked in the ticket area has no marks at all, even though the owner responded or was expected to respond. The crew discovers it by exposure, by a visible surface feature that no mark explains, or by comparing the plan and the ticket responses against the ground. A missed facility overlaps with the unmarked case in CGA Best Practice 5-21, and Lesson 56 covered the related case where a found facility cannot be identified at all. If the found facility can be tied to an owner who should have marked it, the marking failure is part of the story. If its identity and owner cannot be established from reliable information, it is also handled as an unknown utility until the owner answers.

The fourth form is the facility not found where expected. Marks are present, the crew exposes carefully at the marked position inside the tolerance zone, and the facility is not there. The pothole is empty. Lesson 65 taught the limit that controls this case: an empty hole proves only that the facility was not found in that hole. It does not prove the corridor is clear. The facility may be offset beyond the hole, deeper or shallower than the search reached, misidentified in the records, or not present at all. Until the owner rechecks, the marked position and the empty result are a disagreement that must be reported, not a clearance the crew grants itself.

A mismark is different from a normal approximate mark. Approximate means the facility sits near its marks, inside the margin the system expects, and careful exposure inside the tolerance zone finds it where planning assumed it would be. A mismark means that assumption has failed. The distinction matters because the response is different. Approximate marks are worked with, using careful methods. Mismarked ground is stopped, protected, and reported, so corrected marks can replace wrong ones before powered work relies on them.

A mismark is also different from a faded or destroyed mark, covered in the comparison later in this lesson. In a mismark, the marks are present and readable, but wrong. In a faded or destroyed case, the marks were placed and may have been correct, but weather, traffic, mowing, grading, or the work itself has made them illegible or removed them. That case calls for a refresh or re-mark because the map has been lost. A mismark calls for a correction because the map is wrong. Some states use the same ticket door for both requests, and some use different ticket types, which is one reason the state process must be checked instead of assumed.

Why do mismarks happen? The sources for this lesson point to a short list of causes, stated here without ranking them for any single job. A locator can make an error in reading a signal or marking a line. Facility records or maps can be incorrect, incomplete, or out of date, so the locator marks what the record shows rather than what the ground holds. A tracer wire, which is a wire buried with a nonmetallic facility so a signal can be applied to it for locating, can be broken, disconnected, or connected in a way that distorts the signal. A facility can be unlocatable by the methods used, because of its material, depth, damage, or lack of an access point. Congested corridors, splices, and nearby metal can distort a locating signal. None of these causes can be proved from the surface by the excavator. Naming a cause is the owner and locator side of the follow up. The excavator side is to report the mismatch with enough detail that the cause can be found.

What Does It Look Like?

A mismark rarely announces itself from the surface before digging starts. Paint can look fresh, flags can stand straight, and the pattern can look complete while still being wrong. Most mismarks are discovered by comparison: marks compared with a plan, marks compared with visible features, or marks compared with what careful exposure actually finds. Learn the comparisons, because they are how the problem becomes visible.

The clearest look is an exposed facility in the wrong place relative to its marks. A crew potholes at a crossing and finds the pipe or conduit well to one side of its paint line. The exposed facility runs outside the band the crew built as the tolerance zone, or it crosses the planned bore path at a point where the marks showed clear ground. The facility itself looks ordinary. It is the relationship between the facility and its marks that is wrong, and a tape measure between the paint and the exposed facility is what turns a feeling into a finding.

A second look is the empty pothole. The crew opens a small, careful test hole at the marked position, reaches the depth and area the plan expected, and finds undisturbed soil and no facility. The hole is neat, the marks above it are clear, and there is nothing in it. That emptiness is evidence, but it is limited evidence. It says the facility was not found in that hole. It does not say where the facility is, and it does not say the facility does not exist.

A third look is a facility where no marks are. During careful excavation, a crew exposes a pipe, cable, or conduit that no paint, flag, or ticket response accounts for. Or the first sign is above ground: a pedestal, riser, valve, meter, handhole, or pipeline marker that no mark explains, in ground the plan treats as clear. Lesson 56 taught that a found facility with no reliable identity is handled as unknown and treated as live. When the facility is later tied to an owner who was on the ticket, the same find is also a missed mark that needs correction for the rest of the job.

A fourth look is a pattern that does not make sense on its own terms. Marks turn where no structure or feature suggests a turn. Marks end in the middle of a run with no structure to end at. Two owners appear to have marked the exact same line in the same color with no separation. A mark crosses a building, a driveway, or another feature in a way that conflicts with the visible plant serving that feature. Marks show a service running to a building, but the meter or entry point on the building sits on a different wall. None of these patterns proves a mismark by itself. Each one is a reason to ask the owner a question before excavation tests the pattern with equipment.

A fifth look is a depth or direction surprise during exposure. Marks give no depth, so a shallow or deep facility is not by itself a mismark. But an exposed facility that runs in a different direction than its marks show, enters a structure the marks did not approach, or connects toward a different building than the marks suggest, is showing that the marked alignment and the real alignment have parted company. Direction is part of what marks claim to communicate, so a direction mismatch belongs in the report.

What a mismark does not look like is damaged paint. Scuffed, faded, oversprayed, or knocked down marks are a condition problem, not proof the original locate was wrong. Keep the two observations separate in your notes: what the marks say, and what condition the marks are in. The owner needs both facts, stated separately, to choose the right fix.

Whiteboard illustration: what to do when a utility is mismarked

What Does It Do?

Read this heading two ways, because a mismark and the correct response to it do opposite work.

A mismark, left uncorrected, quietly moves risk to the wrong piece of ground. The crew protects the painted band and relaxes outside it, while the real facility sits in the ground the crew thinks is clear. Every protection the system built, the tolerance zone, the careful exposure at crossings, the bore plan clearances, is built from the marks. Wrong marks build those protections in the wrong place. A mismark also corrupts the record. Photographs of wrong marks, a plan updated from wrong marks, and a pothole record tied to the wrong facility all teach the next crew the same error with more confidence.

The correct response process does the opposite. It stops the error from becoming a strike, and it repairs the map for everyone who follows.

First, it freezes the risk in place. Stopping work in the vicinity keeps powered equipment from testing a wrong mark with a bucket, an auger, or a drill head while the question is open.

Second, it protects the evidence and the facility. An exposed facility is supported and protected while the excavation is open, as federal rules require, and the marks, the hole, and the measurements are preserved long enough to be documented and shown to the locator who returns.

Third, it puts the correction in the hands of the only party who can make it. Only the owner or its locator can re-locate the facility and place corrected marks that the owner stands behind. The response process routes the finding to that party through the notification center or directly, with the ticket reference the state system uses to track it.

Fourth, it creates a record that outlives the day. Measured offsets, photographs, and a written report let the owner fix its records, let the project update its plan, and let the next excavator in the same corridor start from corrected information instead of repeating the search.

Where Does It Fit?

A mismark fits into the damage prevention sequence at the point where verification meets excavation. The sequence from earlier lessons runs: plan the work, file a locate request through 811, wait for owner responses, check positive response where the state provides it, read the marks, verify by careful exposure inside the tolerance zone at crossings and close points, and then excavate on verified information. A mismark is discovered inside the verification step, or just after it, when exposure or comparison shows the marks cannot be trusted at that spot. The response is a loop back to the owner side of the sequence: report, re-locate, receive corrected marks, verify again, and only then proceed on the corrected information.

It fits inside a layered set of rules, and the layers must be kept separate.

Federal law sets a worker protection floor. The federal Occupational Safety and Health Administration, usually shortened to OSHA, states its excavation duties in 29 CFR 1926.651(b). The estimated location of underground installations must be determined before an excavation is opened. Utility companies or owners must be contacted and asked to establish the location of their installations. When excavation operations approach the estimated location, the exact location must be determined by safe and acceptable means. While the excavation is open, underground installations must be protected, supported, or removed as necessary to safeguard employees. OSHA also provides that when owners cannot respond within 24 hours, unless a longer period is required by state or local law, or cannot establish the exact location, the employer may proceed only with caution and with detection equipment or other acceptable means used to locate the installations. That federal proviso is narrower than it is sometimes quoted. It is not permission to ignore a known mismatch on the ground in front of you, and it does not replace the state damage prevention process for correcting marks. This lesson does not present it as a mismark procedure.

State damage prevention law sets the ticket process for the place of work. It defines who must be notified, what ticket types exist for a discrepancy, a damage, a discovery, or a re-mark, what notice the excavator must give, and what timelines apply to the owner response. Those details differ by state, sometimes in important ways. One state may route a mismark report as a locate discrepancy dispute. Another may use a second notice or a re-locate request on the same ticket. A third may require direct notice to the owner in addition to the center. The state law and the state 811 center guidance for the place of work control. No timeline, ticket name, or notice period in this lesson should be carried across a state line as a universal rule.

Industry best practice describes the shared shape of the response. CGA Best Practice 5-21 states that the excavator notifies the facility owner or operator directly or through the 811 center if an underground facility is not found where one has been marked, or if an unmarked underground facility is found. Following that notification, the excavator may continue work if the excavation can be performed without damaging the facility, unless state or provincial law specifies otherwise. The practice description adds that when an excavator finds an unmarked or inaccurately marked facility, excavation stops in the vicinity of the facility and notification takes place, and that if excavation continues, the excavator plans the excavation to avoid damage and interference and protects facilities from damage. Read that as the industry pattern, with state law controlling the details on any real job.

Contract and project rules sit on top of those layers. A project specification, a facility owner requirement, or an employer procedure can require more than the state minimum, such as stopping a wider area, notifying a project coordinator in parallel, or holding all bore work on a line until corrected marks are verified. When layers appear to conflict, the stricter applicable requirement and the direction of the responsible crew leadership govern, and the question goes to a supervisor rather than being settled by the person standing at the hole.

A mismark also fits into industry learning after the job. The CGA Damage Information Reporting Tool, usually shortened to DIRT, collects voluntary damage and near miss reports and publishes annual analysis of root causes. In the CGA 2024 DIRT Report summary, which analyzed 196,977 unique damage reports, two of the leading root causes were locating failures stated in plain terms: facility not marked due to locator error, listed at 11.94 percent of damages, and facility marked inaccurately due to locator error, listed at 8.58 percent. A further cause, facility not marked due to incorrect facility records or maps, was listed at 2.16 percent, and marks faded, lost, or not maintained at 2.17 percent. Those figures are national voluntary report figures for damages in one year, not a prediction for any single job. They are included here for one reason: mismarks and missed marks are not rare theory. In the national data they are a recurring, named cause of real damage, which is why the reporting step in this lesson matters beyond the single hole in front of you.

Why Does It Matter?

It matters first for safety. The facilities most often buried in a fiber corridor include gas and electric plant. A crew that trusts wrong marks can place a bore path, a trench, or a pit directly through a live gas line or electric cable that the paint placed somewhere else. The tolerance zone cannot protect a facility that is not inside it. Stopping and reporting is the step that rebuilds the zone around the real facility before powered work reaches it.

It matters because a mismark is a system finding, not a single point finding. If one mark for a facility is offset, the marks for the same facility at the next crossing may be offset in the same way, because the same signal, the same records, and the same locator produced them. A crew that quietly adjusts at one hole and keeps the rest of the original plan has fixed one point and left the system error in place for the next crossing, the next bore, and the next crew. Reporting the mismatch is what gets the whole run rechecked, not just the hole that happened to reveal it.

It matters for the record and for responsibility. State laws tie questions of liability and enforcement to whether each party followed the damage prevention act: whether the excavator gave proper notice, verified before digging, stopped and notified when a mismatch was found, and whether the owner marked accurately and responded to correction requests. A documented report, with the ticket number, the time, the measured offset, and photographs, is the evidence that the excavator side did its part. An undocumented quiet adjustment leaves no evidence for anyone, including the crew that made it.

It matters for cost and trust in a practical way. A re-locate visit is a small, scheduled cost. A strike is an unscheduled repair, an outage, possible injury, regulatory reporting, and a damaged relationship with the owner whose plant was hit and with the customer whose road or yard is open. Owners and locators cannot fix records they never hear are wrong. Every accurate mismark report improves the records the next locate in that corridor will be built from.

Finally, it matters because of a habit this level has built on purpose. Marks are approximate, records can be wrong, and the ground is the final source. When the ground and the marks disagree, the ground wins, the work pauses in the vicinity, and the owner is asked to redraw the map. A crew that treats a mismark as an embarrassment to hide will hide the next one too. A crew that treats it as normal, reportable information will catch the next one earlier.

What Does Good Look Like?

Good mismark response is calm, specific, and fast at the reporting step even though the digging step has paused. It looks like this.

Work stops in the vicinity of the mismatch as soon as it is recognized. Powered equipment is pulled back from the affected area. Work elsewhere on the site that does not depend on the disputed marks may continue only as crew leadership directs, under state law and project rules, and only where it can be done without damaging any facility.

The facility, if one was exposed, is protected and supported while the excavation is open. The hole is guarded so people and traffic cannot reach it. Nothing is backfilled over the evidence before it is documented, unless safety or the direction of crew leadership requires it, in which case the documentation happens first or the reason is recorded.

Notification happens promptly, and within any time limit set by state law or the project procedure, through the facility owner directly or through the 811 notification center, following the ticket process the state provides for a discrepancy or re-locate, and in parallel through the project channel to the foreman, inspector, or coordinator who owns utility coordination for the project. If state law or the project procedure requires notice both directly and through the center, both are given. Reporting the same shift is the practice this lesson teaches, because the evidence is still open and the ticket is still active. The report names the ticket, the facility and owner if known, the exact location of the find in a form another person can return to, what the marks showed, what exposure found, and whether any contact or damage is known or suspected. If damage of any kind has occurred, that fact is stated at once and plainly, because damage notice duties are separate and are set by state law and the owner.

Documentation is measured, not estimated from memory. The crew records the distance from the marks to the exposed facility, measured at a stated reference point, the depth or cover only where it was already safely known from the exposure, the size, material, and direction of the exposed facility as observed, and photographs that show the facility, the marks, and a tape or other scale in the same frame where it is safe to take them. The date, time, and names of the people notified are written down.

Nobody on the excavator side moves the paint, redraws the line where the facility was found, or replants flags as a replacement locate. The original marks are left as they were found, or their condition is noted if work had already disturbed them, so the returning locator can see both the original error and the exposed truth. Temporary flagging or barricading placed to protect the exposed facility or warn the crew is labeled and understood as protection, not as a new locate mark, and it does not use the owner mark pattern in a way that could be mistaken for one.

Corrected marks are verified before work resumes on them. When the locator returns and re-marks, the crew compares the new marks with the exposed facility it already knows, confirms the correction closes the gap that was reported, and only then rebuilds its tolerance zones and its bore or trench plan from the corrected information. If the corrected marks still do not match the exposure, the loop runs again. A second report on the same facility is not a failure. Digging on marks known to be wrong would be.

What Can Go Wrong?

The failures around a mismark are predictable, and each one starts as a shortcut that sounds reasonable at the hole.

Keeping digging on a guess. The crew finds a facility offset from its marks, decides the rest of the line probably runs parallel at the same offset, and shifts the bore by that amount without a re-locate. A facility can bend, rise, fall, or return to its marked alignment between holes. A parallel guess built from one exposure can steer the bore into the facility at the next bend, or into a second facility nobody had exposed. One measurement describes one point, as Lesson 65 taught. It does not redraw a run.

Moving the paint yourself. A crew member sprays a new line over the exposed facility or moves the flags to where the line was found, so the ground will look right. That new line was not placed by the owner locator, is not backed by the owner records or the ticket, and will be read by every later worker as if it were an official mark. If it is wrong beyond the exposed point, and it usually is, it becomes a second mismark created by the excavator. It can also erase the evidence of the original error the owner needed to see. Protective marking to guard a hole is different from re-marking a facility, and the two must never be allowed to look alike.

Treating an empty pothole as an all clear. The hole found nothing, so the crew bores through the marked position at full speed. The facility may sit just outside the hole, just below the depth searched, or under a different alignment entirely. An empty hole is a report to the owner, not a clearance certificate. Boring on it converts an information problem into a blind crossing.

Assuming the mismark is the only error. A crew reports one offset, receives a correction for that one crossing, and then trusts every other mark on the ticket without a fresh look. The cause that shifted one mark, a bad record, a distorted signal, a broken tracer wire, can affect the whole run or the whole corridor. After a confirmed mismark, care rises for the surrounding marks of the same facility and the same owner, and crossings on that line deserve fresh verification before powered work reaches them.

Waiting to report. A find reported at the end of the week may be reported after the hole is backfilled, the marks are gone, the crew has left the corridor, and the locator can no longer see what the crew saw. Late reports also leave the intervening days of work running on known wrong information. Report promptly, the same shift as the practice this lesson teaches, while the evidence is open and the ticket is active.

Reporting vaguely. A note that says the gas line was off somewhere near the corner gives the owner nothing to act on. Which ticket, which facility, which direction of offset, by how much, measured from what, and is the facility exposed and protected right now? A vague report restarts the investigation from zero and can send the locator to the wrong street segment entirely.

Confusing the categories. A crew requests a simple refresh for faded paint when the real problem is that the fresh marks were wrong, so the locator repaints the same wrong line more brightly. Or a crew reports a mismark when the marks were correct but destroyed by its own grading, so the follow up investigates a locate that was never wrong. Naming the problem accurately, wrong marks, missing marks, or lost marks, gets the right fix the first time.

Working outside your role. A reader of this lesson who attempts to re-locate a line with borrowed equipment, to direct a bore around a mismarked facility on personal judgment, or to decide that a state notice step can be skipped, has left the recognition role this lesson teaches. Those decisions belong to the owner locator, to qualified crews, and to responsible crew leadership under the law of the state where the work occurs.

Damage handled as a mismark. If the facility was contacted, nicked, scraped, dented, or cut during the discovery, that is no longer only a mismark report. Damage, including damage that looks minor, triggers its own notice duties to the owner and, where the facility is gas or another hazardous facility, emergency steps that state law and owner procedures set out. Never fold a damage fact into a routine correction request, and never cover damaged plant back up to keep the day simple. State the damage first and plainly in the notification.

What Should Someone Notice in the Field?

You do not need to be the locator or the excavator to be the person who catches a mismark. Notice these things, from outside the excavation, and raise them through the project channel.

Notice a tape measure moment. When a facility is exposed, does anyone compare its position with its marks before the hole is closed? An exposure that is measured against the paint produces the offset fact a mismark report needs. An exposure that is looked at and buried without that comparison can hide a mismark that was visible for ten minutes.

Notice the empty hole conversation. Listen for how an empty pothole is described. Found nothing in that hole is accurate language. The line is not there, or the corridor is clear, is a conclusion the hole cannot support. The second kind of sentence should trigger a question: has the owner been notified that the marked facility was not found?

Notice marks that disagree with visible features. A service mark that runs to the wrong side of a building from its meter, a line that ends at no structure, a crossing mark with no corresponding mark continuing on the other side of the road, or a pedestal or handhole sitting well off the line its marks draw. Surface features are free evidence. A mismatch between features and marks is a question that costs nothing to ask before digging.

Notice a crew working around a known mismatch without paperwork. If the talk on site is that the line is really over there, but the ticket, the plan, and the marks still show it here, and no re-locate has been requested, the job is running on spoken information that the next shift and the next crew will never see. Spoken corrections die at the gate. Written reports and corrected marks survive.

Notice fresh paint in the excavator handwriting. Official marks carry the pattern and identifiers of the owner locate, as Lesson 59 described. A single new line in a different style, appearing after an exposure, with no locator visit in between, may be a well meant field correction. It should be asked about, not trusted, because only the owner side can issue corrected marks.

Notice condition and correctness reported as one blur. A good field report states them separately: the marks are legible or faded, and the marks agree or disagree with the exposure. A report that only says the marks are bad gives the owner no way to choose between a refresh and a re-locate.

Notice your own relief response. Finding a facility a safe distance from the planned path feels like good luck, and the temptation is to accept the luck and move on. Direction does not matter to the duty. A facility found outside its marks on the safe side is still a mismark, the next crossing on that line may be offset toward the work, and the report is still owed. Report the lucky ones too.

Carry the short routine for any suspected mismark. Stop in the vicinity. Protect the facility or the search area. Tell the foreman or inspector at once. Record the marks, the exposure, the measured offset, and photographs. Notify the owner directly or through 811, and through the project channel. Wait for corrected marks. Verify the correction against what you already exposed. That routine is the field form of this lesson.

Practical Example

The following example is hypothetical. The people, the project, and the measurements are invented to teach the response process. Any resemblance to a specific real job is unintended.

Hypothetical example. A fiber crew is preparing to bore a new conduit across a side street. The locate ticket is current, positive response shows all owners have responded, and a yellow line marks a gas facility crossing the planned bore path. Yellow in the APWA color code means gas, oil, steam, petroleum, or other gaseous materials. Following the plan, a qualified vacuum excavation crew opens a test hole at the crossing to expose the gas facility before the bore, as Lesson 65 described.

The pothole at the marked position exposes the gas pipe, but the tape tells a story the plan did not expect. The pipe sits farther from its marks than the tolerance distance allows, outside the band the crew expected from the marks, on the side toward the planned bore path, and it runs at a slight angle to the paint instead of parallel under it. The foreman, Dana, stops bore setup in the vicinity of the crossing. The exposed pipe is protected while the hole is open, and the hole is barricaded. Nobody sprays a new yellow line over the pipe, and nobody moves the original flags.

Dana documents before anything is covered. Photographs show the original paint, the exposed pipe, and a tape stretched between them. The record states the ticket number, the measured offset from the marks to the pipe at the hole, the observed size and material of the pipe, the direction it runs as it leaves the hole, and the fact that no contact or damage occurred during the careful exposure. Dana notifies the gas owner through the 811 notification center using the discrepancy process the state provides, notifies the owner directly as the project procedure requires, and files the same facts through the project channel the same shift.

The owner sends its locator back. The locator finds that the original signal had followed a tracer path that pulled the marks off the true alignment on this segment, re-locates the facility, and places corrected marks that match the exposed pipe and adjust the run on both sides of the crossing. Dana compares the corrected marks with the pipe the crew already exposed, confirms they now agree, rebuilds the tolerance zone from the corrected marks and the confirmed facility position, and the designer adjusts the bore path to keep the separation the project requires at the true crossing point. Only then does the bore proceed, with the crossing watched as planned.

For contrast, the second crossing on the same street shows the other starting case. The test hole at the marked position for a communications conduit comes up empty. Dana does not log the crossing as clear. The empty result is reported the same way, the locator returns and finds the conduit offset beyond the first hole, corrected marks are placed, and a second exposure at the corrected position verifies the facility before the bore plan is finalized for that crossing.

The teaching points are plain. Both discoveries, a facility in the wrong place and a facility not found at all, entered the same response loop on the day they were found. The crew contributed the stop, the protection, the measurements, and the report. The owner side contributed the re-locate and the corrected marks. Neither side did the other side job, and the bore ran on verified ground at both crossings.

Key Terms

Mismark: Marks that do not correctly represent the facility they claim to show, beyond the normal approximate margin, including marks offset from the facility, marks placed on the wrong facility, a facility missed in the marking, or marks placed where the facility is not found on careful exposure.

Offset: The measured distance between a mark and the actual facility it represents, stated with the direction of the difference and the reference points it was measured between.

Re-locate (re-mark, correction request): A request through the notification center or directly to the owner, under the ticket process of the state where the work occurs, asking the owner or its locator to recheck a facility and place corrected marks. Ticket names for this request vary by state.

Notification center: The state one call system, commonly reached by dialing 811, that receives locate and related requests from excavators and routes them to facility owners.

Facility owner or operator: The company, agency, or person that owns or operates a facility and holds its records. Only this party, or its locating contractor, can place or correct marks for its facility.

Locator: The person who uses owner records and detection equipment to designate the approximate position of a buried facility and place its marks, working for the owner or its contractor.

Tolerance zone: The horizontal band made of the width of a facility plus the set distance state law provides on each side of its outside edge, inside which careful exposure methods are used until the facility is confirmed. Covered in Lesson 63.

Potholing (daylighting, test holing): The careful exposure of a buried facility at a specific point, by hand digging or vacuum excavation, to ascertain and record its precise horizontal and vertical position. Covered in Lesson 65.

Positive response: A system used in many states through which owners report the status of a locate request, so an excavator can confirm which owners have marked, have no facilities in the area, or have not yet responded. Covered in Lesson 64.

Unmarked facility: A facility for which no marks account in the work area. It may have been missed in the marking, may belong to an owner who was not notified, may sit outside the ticket area, or may be a private facility outside the public locate system.

Unknown utility: A facility whose identity, owner, or status cannot be established from reliable information available to the project. It is treated as live and handled under the routine in Lesson 56 until an owner answers for it.

Faded or destroyed marks: Marks that were placed but have become illegible or been removed by weather, traffic, or work activity. This is a loss of the map, handled by a refresh or re-mark request, and it is different from a mismark, where readable marks are wrong.

Tracer wire: A wire buried with a nonmetallic facility so a locating signal can be applied to it. A broken or incorrectly connected tracer wire is one possible cause of a distorted locate.

DIRT: The CGA Damage Information Reporting Tool, a voluntary reporting system whose annual reports analyze the root causes of damage to underground facilities, including locating errors.

Check Your Understanding

Answer each question in your own words before reading the answer key.

  1. Name the four forms a mismark can take, and give the field evidence that reveals each one.
  1. A pothole at a marked crossing exposes a gas pipe farther from its marks than the tolerance distance allows, outside the band the crew expected from the marks. List, in order, the steps the crew should take before the bore crosses that line.
  1. How is a mismark different from a faded mark, and why does the difference matter for the request the excavator files?
  1. A test hole at a marked position comes up empty. A crew member proposes boring through that spot because nothing was found. What is wrong with the proposal, and what should happen instead?
  1. Why must a mismark be reported even when the facility was found on the safe side of the planned work, well away from the bore path?

Answer key:

  1. Offset marks: exposure finds the facility farther from its marks than the tolerance distance allows, outside the band the crew expected from the marks, or far enough from them to mislead the work. Wrong facility marked: exposure or records comparison shows the marks belong to a different line than the one intended, for example a neighboring or abandoned line. Missed facility: a facility is exposed, or a surface feature is found, that no marks or response accounts for. Facility not found: careful exposure at the marked position produces an empty pothole where the facility was expected.
  2. Stop work in the vicinity and pull powered equipment back. Protect and support the exposed pipe while the hole is open and guard the hole. Document the find with the measured offset from the marks, the observed size, material, and direction, and photographs showing the marks, the facility, and a scale. Notify the gas owner directly or through the 811 notification center under the state discrepancy or re-locate process, and notify the project channel promptly, the same shift as the practice this lesson teaches, stating plainly whether any damage occurred. Request a re-locate and wait for corrected marks. Verify the corrected marks against the exposed pipe, rebuild the tolerance zone and the bore plan from the corrected information, and only then bore the crossing.
  3. A mismark means readable marks are in the wrong place or missing for a facility that should have been marked. The map is wrong, and the fix is a correction or re-locate by the owner locator. A faded or destroyed mark means marks were placed but weather, traffic, or work has made them illegible or removed them. The map is lost, and the fix is a refresh or re-mark. Naming the problem correctly gets the right response, and some states route the two requests as different ticket types, so the state process must be followed as written.
  4. An empty hole proves only that the facility was not found in that hole. The facility may be offset just outside the hole, below the depth searched, or on a different alignment. Boring on an empty result treats a failed search as a clearance. Instead the crew should protect the search area, document the empty result and the marked position, notify the owner directly or through 811 that the marked facility was not found, and request a re-locate. The crossing is verified only when the facility is found and exposed, or the owner resolves the discrepancy through the state process.
  5. A mismark is a system finding about that facility and that locate, not only about one hole. The same signal, records, or locator error that offset the mark at the safe crossing can offset the marks at the next crossing, possibly toward the work. Reporting gets the whole run rechecked and the owner records corrected. Staying silent leaves the error in place for the rest of the job and for the next excavator, and leaves no record that the excavator side did its part.

Lesson Takeaway

A mismark means the map on the surface and the facility in the ground disagree by more than approximation allows: marks offset from the line, the wrong line marked, a line missed, or no line where the marks promise one. The discovery usually comes from verification, an exposure in the wrong place relative to its paint, an empty pothole, or a facility where no marks are. The response never changes in shape. Stop in the vicinity, protect what you found, document it with measurements and photographs, notify the owner directly or through 811 and ask for a re-locate through the state ticket process, and verify the corrected marks against the ground you already know before work relies on them. Never move the paint yourself and never dig on a guess, because a field drawn line is just a second mismark with better intentions. State law for the place of work controls the ticket names, notice, and timelines. Your recognition and your report are what start the correction, and that is a real contribution to the safety of the job.

Sources and Technical References

  • Common Ground Alliance, Best Practices, Practice 5-21, Mismarked Facilities: the excavator notifies the facility owner or operator directly or through the 811 center if an underground facility is not found where one has been marked, or if an unmarked underground facility is found; following notification the excavator may continue work if the excavation can be performed without damaging the facility, unless state or provincial law specifies otherwise; when an unmarked or inaccurately marked facility is found, excavation stops in the vicinity and notification takes place, and any continued excavation is planned to avoid damage and protects facilities from damage. Accessed in the CGA Best Practices 22.0 copy hosted by Pennsylvania One Call: https://www.pa1call.org/resourcelibrary/resource/download?id=260
  • Common Ground Alliance, Best Practices 22.0, full text, including Practice 5-19 on the tolerance zone as the width of the facility plus 18 inches on either side of the outside edge, not intended to preempt wider state requirements, and Practice 5-20 on excavation within the tolerance zone: https://carcga.org/BP_22.0_Web.pdf
  • OSHA, 29 CFR 1926.651(b), Specific excavation requirements, Underground installations: estimated location determined before opening an excavation, utility owners contacted and asked to establish locations, a limited proviso for proceeding with caution and detection equipment when owners cannot respond within 24 hours unless a longer period is required by state or local law or cannot establish the exact location, exact location determined by safe and acceptable means as excavation approaches, and installations protected, supported, or removed while the excavation is open: https://www.law.cornell.edu/cfr/text/29/1926.651
  • Common Ground Alliance, 2024 DIRT Report summary: analysis of 196,977 unique damage reports; top root causes included facility not marked due to locator error at 11.94 percent, facility marked inaccurately due to locator error at 8.58 percent, marks faded, lost, or not maintained at 2.17 percent, and facility not marked due to incorrect facility records or maps at 2.16 percent. Figures are from the CGA summary release and describe voluntary national damage reports for 2024, not a rate for any individual project: https://www.einpresswire.com/article_print/843655724/cga-dirt-report-highlights-concerning-levels-of-damages-to-buried-utilities-signals-need-for-industry-wide-changes
  • Maryland Underground Facilities Damage Prevention Authority, resources on Miss Utility disputes: it is the responsibility of the excavator to contact the one call system to file a Code 6 locate discrepancy or Code 7 not complete or in progress dispute, with a related statutory provision on proceeding with caution after re-notification and filing a discrepancy. Included as one state example of a discrepancy ticket process. Maryland ticket names and rules apply in Maryland only: https://mddpa.org/resources/
  • OKIE811, What to Expect: if underground facilities need to be remarked because of work activity or because weather has destroyed the original marks, contact OKIE811 and ask for an update request, with the locate request number on hand. Included as one state example of a refresh or re-mark route, which is distinct from a correction for wrong marks. Oklahoma process applies in Oklahoma only: https://okie811.org/what-to-expect/
  • Texas811, Frequently Asked Questions: the excavator is responsible for knowing the condition of the site and when marks have been wiped out or moved and need to be refreshed; an update or remark can be processed by phone by dialing 811 or online, and a recall can be processed through Texas811 where ticket changes require it. Included as one state example. Texas process and timelines apply in Texas only: https://texas811.org/faq/
  • Missouri 811, The Process: if work must continue beyond the ticket expiration date, or the markings become unclear, a renewal ticket must be requested by the excavator, and a no response ticket is submitted when a utility has not responded. Included as one state example of how renewal, unclear marks, and no response are routed as separate ticket concerns. Missouri process applies in Missouri only: https://missouri-811.org/resources/the-process/

Flagged for verification or follow-up: No universal mismark notice period, response timeline, or ticket name was verified in the sources used, because none exists at the national level in those sources. State damage prevention laws set those details, and they differ. The Maryland, Oklahoma, Texas, and Missouri items above are labeled state examples for that reason, and the process for any real job must be verified with the 811 center and the damage prevention law of the state where the work occurs. The DIRT percentages above are taken from the CGA 2024 report summary release; the full DIRT report should be consulted for its complete methodology, including that reporting is voluntary and that root cause categories are assigned by reporters. No claim in this lesson depends on a specific state timeline being carried into another state.