Right-of-way is the band of land, together with the legal rights in that land, set aside under a road authority’s control so a road can be built, operated, and maintained there. The band is wider than the pavement, often wider than everything the road crew actively maintains, and its true edges are recorded in deeds, plats, and right-of-way plans rather than marked on the ground.

This lesson opens Level 2, Read the Physical Environment, because nearly every placement decision in fiber construction starts with two questions: whose land is this, and do we have permission to work here? Level 1 covered the parts of fiber plant. This level covers the ground those parts sit in, and the ground rules are legal as much as physical. Right-of-way is the first of those rules.

What This Lesson Gives You

  • Walk a roadside cross section in your mind and name which parts sit inside the right-of-way and which parts sit outside it
  • Explain why the corridor is wider than the pavement, and what the extra width holds
  • Read field clues such as pole lines, fences, and survey markers for what they are worth, and say why none of them is the boundary
  • Apply the working rule when the ground and the project drawings disagree: stop at the conflict, protect the work that can proceed, and send the boundary question to the records and the road authority
  • State the difference between a highway right-of-way and a utility easement across private land

Start With the Basics

Stand on the shoulder of an ordinary two lane road and look across it. You see pavement in the middle. On each side you may see a gravel or grass shoulder, a shallow ditch, a row of utility poles, a sidewalk, and then front yards, fences, and houses.

Here is the question this lesson answers: how much of what you are looking at belongs to the road?

Beginning crews usually guess the road is the pavement, plus maybe the shoulder. That guess is too small. The legal corridor set aside for the road is usually wider than the pavement, and often wider than everything the road crew actively maintains. That corridor is the right-of-way, usually shortened to ROW and pronounced “row.” Inside it, the public road authority holds the land, or holds rights over the land, so the road can be built, used, drained, repaired, and improved. Utilities such as power, water, gas, and fiber are commonly allowed to place their facilities inside that same corridor, under permission from the authority that controls it.

Outside the corridor, the land is private property, even when it looks like part of the roadside. A mowed grass strip in front of a house can be public right-of-way that the homeowner maintains, or private yard, or part of each. From where you stand, you cannot tell which. That single fact, that the boundary is real but usually invisible, is the heart of this lesson.

Think of a stadium. The game is played on the field, and the field is what spectators watch. The venue is bigger: stands, concourses, service entries, drainage, and room to rebuild all sit on the same property, and the property line is fixed in the deed, and nobody paints it on the grass. A road works the same way. The pavement is the field. The right-of-way is the whole property the road operation needs, and its edges live in records the same way a stadium’s lot lines live in its deed.

Hold three ideas and the rest will follow:

  • The right-of-way is a band of land, not just the road surface.
  • The band is normally wider than the pavement.
  • The true edges of the band live in records. Nothing in the grass marks them.

What Is It?

Right-of-way is the land, together with the legal rights in that land, that has been acquired, dedicated, or reserved so a road or another transportation facility can be built, operated, and maintained on it. Each part of that definition matters, so take it in pieces.

Land. The right-of-way is a physical area with length and width. It runs along the road, and it has two edges, one on each side. Everything in this lesson is about that band of ground: what sits inside it, who controls it, and how anyone knows where it ends.

Legal rights. The right-of-way is not only dirt. It is also a legal arrangement, and it comes in two forms:

  • In some places the public agency owns the land outright. Lawyers call full ownership fee ownership, or owning the fee.
  • In other places the underlying land still belongs to a private owner, and the public holds a recorded right to use a defined strip of it for road purposes. That kind of right is a form of easement, a legal right to use part of someone else’s land for a stated purpose without owning the land itself. Lesson 22 covers easements in depth.

Either way, the strip functions as the road’s corridor, and the agency controls what may occupy it.

Acquired, dedicated, or reserved. Those three words, which appear in the federal highway statutes, describe how corridors come to exist:

  • A road authority can acquire land by purchase or, when the law allows and the process is followed, through condemnation, the government power to take private property for public use with compensation.
  • A developer can dedicate land for roads when a subdivision is platted. A plat is a recorded map showing the layout of lots and streets, and dedication means the streets shown on it are set aside for public use.
  • Older roads sometimes rest on long public use recognized under state law.

The method differs by place and by road. The result is the same: a defined corridor under the control of a road authority, the public agency or other owner that owns or manages the corridor, such as a state department of transportation, a county road department, or a city public works department.

Federal definitions match this picture. The federal regulation that governs highway right-of-way, 23 CFR Part 710, defines right-of-way as real property and rights in that property obtained for the construction, operation, maintenance, or mitigation of a transportation facility funded under the federal highway laws. Real property means land and interests in land. Even the federal definition is land plus rights, obtained for a transportation purpose. That definition applies to the federal aid highway program. State and local roads are governed by state law and local records, which use similar ideas with their own wording. One level of government’s wording never substitutes for another’s records.

Now place the right-of-way next to two neighbors it is often confused with.

The first neighbor is the road itself. The traveled way, the pavement or gravel surface people drive on, sits inside the right-of-way. So do the shoulders, the drainage ditches, the slopes that hold the road up, signs, guardrail, and usually sidewalks. The right-of-way is the whole corridor. The road is one thing inside it.

The second neighbor is the easement, covered fully in Lesson 22. The short contrast is this. A highway right-of-way is the corridor held for the road, usually by a public agency, and it exists whether or not any particular utility ever uses it. An easement is a specific right over a specific piece of someone else’s land for a specific purpose, such as a utility easement across a backyard where no road exists. Fiber plant lives in both: inside public right-of-way where the route follows roads, and inside easements where the route crosses private land. This lesson is about the road corridor. The next lesson is about crossing private land.

Restated simply: the right-of-way is the band of land, and the rights in that land, set aside under a road authority’s control so the road and the facilities the authority allows, including utilities, can be built, operated, and maintained there over the long term.

What Does It Look Like?

The right-of-way itself is mostly invisible. You cannot see a legal boundary. What you can see is the corridor’s contents, arranged in a pattern that repeats often enough to learn. Reading that pattern is a field skill. Treating it as a boundary measurement is a mistake.

Walk the cross section of a typical rural or suburban road from the center outward:

  • Traveled way in the middle: the pavement vehicles drive on.
  • Shoulders at the pavement edges: paved, gravel, or grass.
  • Ditch or swale beyond the shoulder: a shallow channel that carries rainwater along the road, with the ground rising back toward the level of the surrounding land beyond it.
  • Utility band in the outer part of the corridor: poles carrying power and communications cables, or the surface signs of buried plant such as handholes, pedestals, and marker posts. Road signs and mailboxes often stand in this outer band too.
  • Private ground beyond the corridor: front yards, fences, hedges, driveways, and landscaping.

That change in character often sits near the right-of-way edge, because owners build and plant on their own land and stop, roughly, where their land stops. Often is the key word. Owners also mow, plant, and place things inside the right-of-way in front of their homes, and fences are sometimes built in the wrong place. The visible change is a clue, never a measurement.

In town, the pattern compresses:

  • Curb and gutter replace the ditch.
  • A sidewalk usually runs inside the corridor, with a grass strip between sidewalk and curb in many places.
  • Poles may stand behind the sidewalk or in an alley.
  • The right-of-way edge often falls somewhere behind the sidewalk, sometimes close to building faces on older main streets.

There are also deliberate physical clues to the boundary itself. Surveyors sometimes set right-of-way markers, durable monuments such as capped iron rods or concrete markers placed at boundary corners and along boundary lines by or for the road authority. Property corner pins mark the corners of private parcels, and a parcel’s front corners often sit on or near the right-of-way line. You may spot a small metal cap or a flagged pin near a fence corner. These markers are evidence a surveyor uses. Finding one does not tell you where the line runs between markers, and markers can be missing, buried, or disturbed. Noticing them is good field awareness. Relying on them to place plant is not a field crew’s call to make.

What the right-of-way does not look like is a painted stripe. With rare exceptions, nobody paints the edges. There is no universal look, because roads were built in different eras under different standards, and corridors were acquired at different widths at different times. The same road can change width from one segment to the next where parcels were acquired at different dates. Expect a pattern of contents. Do not expect a visible edge.

Whiteboard illustration: what right-of-way is

What Does It Do?

The right-of-way does four jobs, and fiber crews depend on all four.

It holds the road. The corridor carries everything the road needs to work:

  • Shoulders for vehicles that pull off
  • Slopes that support the road bed
  • Ditches and culverts that move water away so the road does not wash out
  • Sight distance at corners and driveways so drivers can see
  • Room for signs and guardrail

Drainage alone explains much of the extra width beyond the pavement. Water has to go somewhere, and the corridor is where it goes.

It reserves room for the future. Roads get widened, resurfaced, and rebuilt. Intersections get turn lanes and signals. A corridor held at a workable width today is what allows those changes later without buying new land parcel by parcel. This is one reason a road authority cares deeply about what gets placed in its corridor and where: an object placed carelessly today can block the authority’s own project tomorrow.

It provides a shared corridor for utilities. Society runs many networks along the same routes: power, water, sewer, gas, telephone, cable, and fiber. Placing them in the road corridor, in an organized way, avoids cutting a separate path across every private parcel on the route. Federal highway policy treats accommodating utilities in highway right-of-way as being in the public interest, and federal rules in 23 CFR Part 645 govern how utilities are accommodated on federal aid highways. That practice is called utility accommodation: the organized placement of utility facilities inside a highway right-of-way under the road authority’s policy and permission. In practice, each state transportation department and many local road authorities run their own utility accommodation policy and permit process under that umbrella, and the state or local rules are the ones a project actually works under. The corridor is shared, and sharing happens by permission, on the authority’s terms.

It makes rights and responsibilities clear, at least on paper. Because the corridor is recorded, everyone can in principle answer the questions construction raises daily. Who may authorize work here? Whose facilities may be here? Who must move or adjust a facility if the road is rebuilt? Who is responsible when something is placed where it should not be? The answers differ by jurisdiction and by the rights each utility holds, which is exactly why the records and the authority settle them.

For fiber work specifically, the right-of-way does one more practical thing: it is where the route is. Fiber follows roads because customers live along roads and because the corridor is the one continuous strip where placement is commonly possible. Nearly every later lesson in this level, on reading plats, permits, and field conditions, comes back to this corridor.

Where Does It Fit?

Right-of-way sits at the very start of a fiber project, before design and long before construction. The sequence looks like this:

  • A provider plans service to an area, and planners sketch a route that follows roads wherever it can.
  • For every road segment, someone establishes two things: a right-of-way exists there under a known road authority, and the provider can obtain permission to place fiber in it.
  • That permission normally takes the form of a permit, a written authorization from the road authority allowing specified work in its right-of-way under stated conditions, or a utility accommodation approval. Sometimes it sits under a broader franchise, a grant from a local government allowing a company to use the public right-of-way to provide a service, usually under stated conditions.
  • Design draws the fiber inside the corridor limits shown on the project records, at the offsets and in the utility space the authority’s rules allow.
  • Permits are issued against those drawings, and construction builds what the permits authorize, inside the corridor they describe.
  • Inspection verifies that the plant landed where it was authorized to land.
  • If part of the route must leave the road corridor and cross private land, that part does not ride on the road permit. It needs its own right over that land, which is the easement work of Lesson 22.

Right-of-way also fits into a bigger legal frame worth being able to sketch:

  • Federal rules apply where federal highway funds and federal aid highways are involved: 23 CFR Part 710 for right-of-way programs and property management, 23 CFR Part 645 for utility accommodation, and 23 CFR 1.23 for the basic rule that right-of-way must be used for highway purposes and that other uses require approval.
  • State laws and each state DOT’s utility accommodation policy sit below the federal frame and are the working rules for state highways.
  • County and city ordinances, permit conditions, and franchise terms govern local streets.
  • Contract documents and project plans apply all of it to one specific job.

When two rules seem to conflict, the project team does not improvise. It takes the question to the road authority and the project’s own engineering and permitting staff.

One more fit matters for later lessons. The right-of-way boundary is also where fiber plant meets the subjects of the next several lessons: easements across private land in Lesson 22, permits and the conditions attached to them, locating existing utilities before digging, and working safely around traffic. Every one of those subjects assumes you know which strip of ground the road corridor is, and which ground is not the corridor at all.

What Is at Stake

Placing fiber in the wrong ground is one of the most expensive mistakes in outside plant, and it is a paperwork mistake before it is a construction mistake.

If plant is built outside the corridor and outside any easement, it sits on private land without rights. The industry word for an unauthorized placement on someone else’s land or outside authorized limits is encroachment. The consequences are practical:

  • The landowner can demand removal.
  • The road authority can require an unauthorized facility to be moved, and the cost of moving plant that was placed without rights commonly falls on the facility owner.
  • Work can be stopped while the dispute is sorted out.
  • A crew that pulls out finished plant and builds it again in the right place has doubled the cost of that segment and damaged trust with the authority that issues the next permit.

The corridor is also shared and crowded. The strip that looks empty is often assigned, by the authority’s accommodation rules and by older placements, to water, sewer, gas, power, and drainage. Fiber placed without reference to the corridor records can land on top of another utility’s facilities, inside the drainage path, or in space the authority is holding for a future road project. The right-of-way records and the permit process exist to keep those collisions from happening.

The road authority’s own work comes first. The corridor exists for the road. A utility occupies it by permission, and that permission is commonly conditioned: facilities may have to be adjusted or relocated when a road project requires it, under the terms of the permit, the accommodation policy, and the rights the utility holds. Crews who understand that the corridor belongs to the road are not surprised by relocation orders. Crews who think of the roadside as open ground are.

The boundary question also comes up daily, and the wrong shortcut is tempting. The shortcut says the right-of-way probably ends at the fence, or at the pole line, or at a set distance from the center of the road. Each of those is sometimes close and sometimes badly wrong, and the failure cases are the expensive ones. There is no universal right-of-way width. Widths were set road by road and parcel by parcel, in deeds, plats, and right-of-way plans, and they vary along a single road. The professional habit this lesson is building is simple: work from the project records, and treat every field observation as a clue to check against them.

What Does Good Look Like?

Good right-of-way work is quiet. Nothing about it makes a story later. Standing on a well run job, you could verify these conditions:

  • The project file identifies the road authority for every segment of the route: state, county, city, or another owner.
  • The file holds the permit or accommodation approval for the work, and the drawings show the corridor limits and the approved placement inside them.
  • Where the route crosses private land, the file holds the easement for that crossing, so no segment of the route rests on an assumption.
  • The crew leader can answer three questions for any point on the route: whose corridor is this, what document authorizes our plant here, and where on the drawing is the corridor edge relative to where we are standing?
  • When field conditions do not match the drawings, the discrepancy is reported and resolved by the people authorized to resolve it. The crew does not improvise a new line.
  • During construction, plant goes in at the permitted location inside the corridor, drainage is kept working, and disturbed ground is restored.
  • Survey markers and property pins that were there before the work are still there after it. If a marker must be disturbed, that fact is reported, because resetting boundary markers is licensed survey work.
  • After construction, as-built drawings show where the plant actually sits relative to the corridor, so the next crew, the next designer, and the road authority all start from truth instead of from a guess.
Whiteboard illustration: the fence is a clue, not the line, how the roadside looks vs. what the records show

From the Field

Picture a fiber crew extending service along a county road to reach a small subdivision. The project drawings, built from the county’s right-of-way records and the subdivision plat, show the county corridor extending beyond the ditch on both sides of the road. The approved design places a buried conduit run in the outer part of that corridor, with handholes at intervals.

On the first morning, the crew leader walks the segment with the drawing in hand. For most of the segment, the ground matches the drawing: ditch, then open grass band, then yard fences roughly where the drawing suggests private land begins.

At one house, the ground stops matching. A split rail fence and a row of young trees stand well inside where the drawing shows the corridor, right on the conduit line. The homeowner, watching from the porch, says the fence is on the line and the trees are his.

The crew leader now holds two conflicting versions of the same boundary: the project records in one hand and a landowner’s claim in the other. Arguing the boundary would settle nothing, because a crew leader’s opinion carries no authority over a property line. Accepting the homeowner’s version would settle nothing either, because landowners can be mistaken about their own lines. Moving the fence or the trees would put the crew in the position of destroying property on a guess.

So the leader does four things. The spot gets marked. The crew shifts to an unaffected part of the segment where the authorization is clear. The fence, the trees, and the conflict get reported to the project manager the same day. The boundary question goes to the county’s records and, if needed, to a surveyor engaged through the project.

Two outcomes are possible, and the project handles either one. The records may confirm the corridor, which makes the fence an encroachment by the homeowner; the county handles that with the homeowner while the project adjusts its schedule. Or the records may show the corridor is narrower at this parcel than the drawing assumed, in which case the design changes or an easement is obtained before anyone builds. Either way, the fiber goes in once, in ground the project has the right to use.

The decision rule: when the ground and the records disagree, stop at the conflict, protect the work you can do, and send the boundary question to the records and the people authorized to answer it.

What Can Go Wrong?

  • Building outside the authorized ground. A crew follows the pole line or the ditch line by eye, drifts past the corridor edge, and places conduit or a handhole on private land. Nobody notices until the owner does. The fix is removal and rebuild at the provider’s cost, plus a landowner who now distrusts every crew that follows.
  • Trusting a rule of thumb for width. Someone states a width from memory, from another county, or from another road, and the design or the crew treats it as fact for this road. A width that was right on the last project can be wrong on this one, and the error only shows when plant lands outside the real corridor or a landowner produces a survey.
  • Mistaking visible features for the boundary. The edge of pavement is not the boundary; the corridor extends beyond it. The ditch is not the boundary; the corridor usually extends beyond the ditch. A fence is not the boundary; fences are built by owners for their own purposes and are sometimes inside the corridor, sometimes outside it, and sometimes simply in the wrong place. A pole line is not the boundary either; poles were placed under their own permits and their own history.
  • Treating permission casually. A crew starts work in a corridor before the permit is in hand, builds a segment the permit does not cover, or crosses private land on a handshake. Verbal understandings do not appear in the project file, and when a question comes, the file is what counts.
  • Disturbing the evidence. Survey monuments and property pins get knocked out by equipment and are quietly forgotten. Those markers are the physical record other people rely on to find the same boundaries later. Disturbing them creates cost and legal exposure far out of proportion to the moment it takes to report the damage.
  • Blocking what the corridor is for. Plant, spoil piles, or parked equipment that dam a ditch, block a driveway or sight line, or sit in space the authority needs creates a safety and drainage problem and a fast complaint. The corridor’s first job is the road and its drainage.

What Should Someone Notice in the Field?

You cannot see the boundary, but you can read the corridor. When you stand on a new segment, notice these things:

  • The cross section. Where is the traveled way, the shoulder, the ditch or curb, and the outer band where poles, pedestals, handholes, and signs usually stand? Placing yourself in that pattern is the start of reading any roadside.
  • The utility line. Existing poles and buried plant markers usually run in the outer part of the corridor, roughly parallel to the road. Their line tells you where plant has been placed before, which is information only. It does not authorize new placement.
  • Where private use begins. Fences, hedges, walls, sprinkler heads, landscaping, and parked personal property tend to cluster on private land. A sharp change in how the ground is used often sits near the corridor edge. Treat it as a hint to check the records, especially when the change and the drawings disagree.
  • Markers. Look for capped rods, concrete right-of-way markers, and property pins, especially near corners and fence lines. Note them, photograph them if your project does that, and keep equipment away from them.
  • Driveways, intersections, and drainage structures. Culverts, ditch lines, and driveway aprons show how water and vehicles move through the corridor. Work that ignores them creates the complaints and the damage claims.
  • Anything that contradicts the plan. A new fence across the work area, a shed or garden inside the corridor, plant where the drawing shows none: these are stop and ask conditions.
  • The safety boundary. Reading a corridor is recognition work. This lesson does not qualify you to survey a boundary, decide a legal question, grant or deny permission, or reset a disturbed marker. Boundary determinations belong to licensed surveyors and the road authority, and permission belongs to the owner or manager of the right-of-way through the project documents and permits. Recognizing a boundary question and routing it to those people is the job at this level.

When the ground and the records disagree, the records and the road authority settle it. The crew’s best guess does not, and neither does the nearest landowner’s opinion.

Key Terms

Right-of-way (ROW): the land, and the legal rights in that land, acquired, dedicated, or reserved under a road authority’s control so a road can be built, operated, and maintained there, together with the facilities the authority allows in it.

Road authority: the public agency or other owner that owns or manages a road corridor, such as a state department of transportation, a county road department, or a city public works department. The road authority sets the conditions for using its corridor.

Fee ownership: full ownership of land. A road authority holds some corridors in fee and holds rights over others without owning the land itself.

Easement: a legal right to use part of someone else’s land for a stated purpose without owning it. Covered in depth in Lesson 22.

Plat: a recorded map of a subdivision or area that shows lots, streets, and the land dedicated for public use, including road right-of-way.

Dedication: setting land aside for public use, commonly through a recorded plat, so the public agency holds the corridor for road purposes.

Utility accommodation: the organized placement of utility facilities inside a highway right-of-way under the road authority’s policy and permission, governed federally by 23 CFR Part 645 for federal aid highways and by state and local policies in practice.

Permit: a written authorization from the road authority allowing specified work in its right-of-way under stated conditions. Working in the corridor without the required permit is unauthorized work.

Franchise: in this setting, a grant from a local government allowing a company to use the public right-of-way to provide a service, under stated conditions.

Encroachment: an unauthorized placement or occupation, such as a structure, a fence, or a utility facility placed outside its authorized ground or without permission.

Survey monument or marker: a durable physical marker, such as a capped rod or concrete marker, placed by a surveyor to record a boundary point. Markers are evidence of a boundary, and resetting them is licensed survey work.

Traveled way: the part of the road vehicles actually drive on. The right-of-way is wider than the traveled way.

Check Your Understanding

  1. In your own words, what is right-of-way, and why is it wrong to say the right-of-way is the same thing as the road?
  1. A crew member says the right-of-way must end at the ditch, because everything past the ditch is yards. What is wrong with that statement, and what should the crew rely on instead?
  1. Why do utilities, including fiber, need permission from the road authority to place facilities in the right-of-way, if the corridor is public?
  1. What is the difference between a highway right-of-way and a utility easement, at the beginner level taught in this lesson?
  1. In the field, you find a fence and trees standing where the project drawing shows open corridor and planned conduit, and the homeowner says the fence is on the line. What do you do, and what do you not do?

Answer Key

  1. Right-of-way is the band of land, and the rights in that land, set aside under a road authority’s control for building, operating, and maintaining the road and the facilities the authority allows in the corridor. The road, meaning the traveled surface, is only one thing inside that band. The corridor also holds shoulders, drainage, slopes, signs, and usually the utility line, so the two are not the same.
  1. The ditch is a drainage feature inside the corridor, not its edge. The corridor usually extends beyond the ditch, and its true limits were set parcel by parcel in deeds, plats, and right-of-way plans. The crew should rely on the project records and drawings, and on the road authority, not on any visible feature or width remembered from another road.
  1. The corridor exists first for the road: its safety, drainage, operation, and future improvement. Public ownership does not make it open ground. Federal policy treats utility accommodation in highway right-of-way as a managed use under regulation and state or local accommodation policies, carried out through permits or agreements that set where facilities may go and on what conditions.
  1. A highway right-of-way is the corridor a public agency holds for the road itself, and it exists whether or not a utility uses it. A utility easement is a specific right over a specific piece of someone else’s land for a stated purpose, such as crossing private land where no road corridor exists. Fiber routes commonly use both, on different segments of the same route.
  1. Do not argue the boundary with the landowner, do not accept any person’s on the spot version as settled, and do not move the fence or trees or build through them. Mark the location, keep work going where it is unaffected if you can do so safely and within authorization, and report the conflict the same day so the project can resolve it from the records and, if needed, a surveyor. Boundary questions are settled by records and authorized people. An opinion offered in the field settles none of them.

Lesson Takeaway

The right-of-way is the road’s corridor: a band of land, wider than the pavement, held under a road authority’s control for the road, its drainage, its future, and the utilities the authority allows inside it. Fiber work happens in that corridor by permission, under permits and records. The corridor’s true edges live in deeds, plats, and right-of-way plans. In the field, read the pattern, respect the clues, and send every boundary question to the records and the people authorized to answer it.

Sources and Technical References

  • 23 CFR 710.105, Definitions, Cornell Law Institute, Legal Information Institute. Federal definition of right-of-way as real property and rights in it obtained for construction, operation, maintenance, or mitigation of a transportation facility funded under Title 23. https://www.law.cornell.edu/cfr/text/23/710.105
  • 23 U.S.C. 109, FHWA. Federal highway statute language defining right-of-way, for the purposes of that subsection, as real property or an interest in it acquired, dedicated, or reserved for the construction, operation, and maintenance of a highway. https://www.fhwa.dot.gov/design/standards/161006b.pdf
  • FHWA Memorandum, Utility Accommodation and Other Uses of Highway Right-of-Way, June 28, 2017. Explains that utility use of highway right-of-way is governed by 23 CFR Part 645 and Part 710, that FHWA treats utility accommodation as in the public interest, and that non-highway uses require a right-of-way use agreement and approval. https://www.fhwa.dot.gov/utilities/170628.cfm
  • 23 CFR 645.111, Right-of-way, Cornell Law Institute. Addresses utility rights of occupancy, including occupancy based on fee, easement, or another real property interest. https://www.law.cornell.edu/cfr/text/23/645.111
  • MassDOT, Utility Accommodation Policy on State Highway Right of Way. A state level example showing that accommodation of utilities in state highway right-of-way is permitted under state law and policy, and that a highway access permit is required to place utilities in the corridor. State policies differ by state; this is one state’s example. https://www.mass.gov/doc/utility-accommodation-policy-0/download
  • Ottawa County Road Commission, Understanding Road Right-of-Way. A local road authority explainer noting that county road right-of-way is intended for road, pedestrian, and public utility purposes, that its width can vary a great deal, and that determining the actual width and location at a given place calls for the recorded documents and, where needed, a surveying or engineering firm. https://olivetownship.org/wp-content/uploads/2016/12/OttawaCounty_Understanding_Road_Right-of-Way.pdf

Previous lesson: Lesson 20: How Does Data Get to the Customer? |
Back to Level 2 hub |
Next lesson: Lesson 22: What Is an Easement?